How They Built the Pyramids Conveyor Routing Guide
Master How They Built the Pyramids conveyor routing with sorter controls, Shabti delivery tips, and practical fixes for backed-up brick production lines.
Jump to

Build a Clear Route From Molds to the Pyramid
Bricks piling up at the wrong crate can stall an otherwise working factory. How They Built the Pyramids conveyor routing connects your production stages so finished bricks reach the construction crew instead of accumulating between machines. Build and test each handoff before expanding the line.
Plan your route around the production chain:
Clay supply → molds and drying → brick collection → processing → construction delivery
Keep clay delivery separate from finished-brick collection. Leave space around the molds for hoppers, drying equipment, and the belt that carries bricks away. Then extend the output route through the processing equipment you actually use, such as Polishing Wheels, before sending bricks toward the pyramid.
Start with one complete route:
- Supply clay to the molds.
- Wait for finished bricks and check that collection keeps up.
- Connect the next processing stage.
- Follow bricks through its input and output.
- Extend the route to your construction delivery point.
Watch the entire chain before adding more molds. A busy production area accomplishes little when its output never reaches the builders.
Official page: How They Built the Pyramids (store.steampowered.com)
Use Splitters, Mergers, and Sorter Rules Deliberately
Use a Splitter when one supply route needs to branch toward separate destinations. Use a Merger when several output belts need to join a shared route. For example, collect the output from multiple Polishing Wheels before sending those bricks onward.
Image: Steam / Pattez Games
Keep room around these junctions. During an expansion, moving a machine slightly can give you space to connect its output without rebuilding the surrounding production area.
A Sorter gives you separate routing rules for its three exits. Look at it and press F to open its configuration window, then set each exit’s rule for the route connected to it. Follow a brick through the junction afterward to check that it reaches the intended destination.
Two changes in version #0.42 matter directly to conveyor layouts:
| Transport feature | Behavior in #0.42 |
|---|---|
| Sorter | Each of its three exits has an individual rule; look at the Sorter and press F to configure it |
| Trolleys | Belts no longer load parked trolleys, and trolleys no longer travel on belts |
If your layout depends on a belt filling a parked trolley, change that handoff. Keep trolley hauling separate from the conveyor connection.
Stop Shabti From Delivering to the Wrong Receiver
Gather-mode Shabti deliver collected items to the nearest Conveyor Belt or Crate. That makes receiver placement part of your routing plan.
Image: Steam / Pattez Games
A nearby crate can pull deliveries away from the belt you intended to feed. When bricks keep appearing in storage, inspect the receivers around the worker before changing the rest of the conveyor network.
Arrange the collection area deliberately:
- Move competing crates away from the collection point.
- Position the intended belt near the items being gathered.
- Check the Work Post’s assignment and working range.
- Watch where the worker deposits the next load.
Keep clay duties focused, too. A worker assigned across a broad area can spend time filling several nearby clay containers. Place the Work Post and adjust its range around the supply point you want maintained.
Gathering and building are separate jobs. For pyramid construction, use Build mode with the Work Post near the structure and bricks within range. Since #0.43, pyramid Work Posts continue building after you move them upward, and their Shabti explain what is preventing work.
If the whole crew stops, check the team wallet. Shabti collect upkeep every minute and strike when the money runs out. Preserve an upkeep reserve when buying new belts, machines, or workers.
Fix the Stage That Is Holding Up the Line
Find the point where bricks stop advancing, then inspect that stage and the next handoff. Adding conveyors only helps when transport is the actual constraint.
Image: Steam / Pattez Games
Empty molds: inspect clay delivery
The Clay Hopper starts with 40 kg of storage and roughly 3.5 meters of feed range. Aim at it to read its clay stock and the number of molds it covers.
Check coverage after rearranging the production area. A full hopper cannot feed a mold outside its range.
Wet bricks: inspect drying coverage
Point Standing Fans toward wet molds and check the Clay & Molds Kiln’s coverage preview. The Glaze Kiln is a separate machine; placing one nearby does not provide mold-drying coverage.
Expand brick transport after the molds consistently produce bricks that are ready to collect.
Stopped machinery: inspect the shaft network
Check network Load/Stress against Capacity. Trace the shaft connection through the Gearbox to the machine’s blue power port.
A Nile Water Wheel must connect to the same shaft network to contribute power. When the network is overloaded, add connected capacity or disconnect machinery until demand fits.
Bricks waiting at processing: inspect output and capacity
At a Polishing Wheel, check incoming bricks, power or assigned workers, and available input and output space.
Match upgrades to the blockage. Polish Time reduces processing time, Bins expands input and output capacity, and Crew adds worker slots up to four. Buying worker slots does not hire or assign Shabti.
Use storage as a buffer between stages when production temporarily exceeds consumption. Keep the route through that storage accessible so accumulated bricks can continue toward processing and construction.
Move the Delivery Point as Construction Advances
A conveyor can keep delivering successfully while the equipment at its end has nothing left to build within reach.
Check the destination when a catapult stops placing bricks. Once the available spaces within its range are filled, relocate it or finish the remaining spaces another way. Extend or reroute its supply belt to match the new position.
Before adding a second launcher, check whether production can supply the one you already have. If it spends time waiting for bricks, expand the slow production stage before splitting its feed again.
For Shabti construction, move the Work Post upward with the active building area and keep bricks within its working range. Use the worker’s status message to identify what is stopping placement.
Special bricks also need a clear route to their intended destination. Keep processing branches distinct when preparing polished, glazed, or gold-coated bricks for different parts of the pyramid.
Version #0.43 fixed carved bricks losing their engravings in Pigeon Lofts, Trebuchets, and the Sledge Lift. Those transport methods now preserve the carving.
Expand the Network for the Grand Pyramid
The standard pyramid takes 23,426 bricks. Grand Pyramid raises that requirement to 105,995 bricks and supports crews of up to 16.
Since #0.43, Grand Pyramid opens every blueprint, including the trader’s, and the Shabti Market from the first brick. Plan space for the complete production chain before packing machines around a temporary route.
Expand in connected sections: clay supply, drying, collection, processing, and construction delivery. Test each added section before increasing its incoming supply. Keep access to junctions and processing outputs so the next expansion has somewhere to connect.
The Reed Highway achievement requires 100 belt tiles running in your world, and its global unlock rate is 75%. Build toward it through useful connections between production stages; keep the final delivery section easy to move as the pyramid rises.
Continue with
How They Built the Pyramids Sledge Lift: Carving FixHow They Built the Pyramids Sledge Lift keeps carvings intact in v0.43. Learn what changed and how to keep engraved bricks moving toward pyramid placement.Join the community
Official channels for news, updates and player help:


